Full warehouse, empty line
The shelves are packed and production is still waiting on parts. Usually the problem is the planning rules, not the supplier.
Most plants know this feeling. The racks are full, the inventory number on the balance sheet keeps climbing, and somehow the one part you need today is on backorder. The supplier gets blamed. Nobody blames the system that ordered everything else sitting on those racks.
Every part treated the same
The most common cause is a planning setup that can't tell parts apart. A two-dollar bracket that moves once a year gets the same reorder logic as the component behind half your revenue. MRP parameters get set at go-live and nobody touches them again, even after the product mix has changed twice. Safety stock gets padded every time someone gets burned by a shortage, and nobody ever trims it back.
The result is too much of what you don't need and not enough of what you do, all paid for with cash that could be doing something else.
What fixing it looks like
It doesn't take new software. It takes sorting parts by how much they actually matter to the business, and planning each group differently:
- Rank parts by value and usage, so the few that drive the business get watched closely and the long tail gets simple rules.
- Reset lead times, lot sizes and safety stock against what suppliers and demand actually do today, not what they did at go-live.
- Name an owner for planning parameters and review them on a schedule, so the settings don't quietly go stale again.
- Put slow and dead stock on a list with a decision date: use it, sell it, return it, or write it off.
What it adds up to
Done properly and kept up, this isn't a rounding error. Same building, same team, same ERP.
One question for this week
When did anyone last look at what's actually moving in your warehouse, and what isn't?
If nobody can answer without a week of spreadsheets, that's usually where the cash is.